NFPA 780-2026 is the Standard for the Installation of Lightning Protection Systems. Its risk assessment sits in Annex L, which is informative: it guides the decision to protect a structure and is not a requirement of the standard. Lumex runs the full Annex L procedure, not a shortcut, and shows the working behind every figure.

Annex L gives two ways to answer the same question. A quick screen settles the clear cases in moments. When the numbers are close, or the facility is one that should not be caught out by a shortcut, the detailed assessment works out four risks from eight components and judges each on its own. New to NFPA 780 itself? See how it compares with IEC 62305, then read on for how Lumex computes it.

L.5 and L.6

Two methods, one annex

The screen decides fast. The detailed assessment goes deeper when the screen is not enough on its own.

L.5 · quick

The simplified screen

Compares the expected strikes to the structure per year, N_D, with a tolerable strike frequency N_C built from the structure's own coefficients. An LPS is recommended when N_D is higher than N_C, and optional when it is not.

L.6 · detailed

The detailed assessment

Works out eight risk components from the structure and its connected services, then rolls them into four risks, R1 to R4, one for each kind of loss. Each risk is judged against its own tolerable value, never a single combined number.

Behind the screen

What N_D and N_C are built from

Both sides of the comparison come from the standard's own coefficients, never a guess.

N_SG

Ground strike-point density

Read from the Vaisala strike-density map. Where only the flash density is known, Lumex converts it to strike points on the ground, the density the 2026 edition asks for.

A_D

The structure's collection area

The equivalent area around the structure that attracts a strike, built from its dimensions, which turns the strike density into N_D, the expected strikes per year.

C2 to C5

Construction, contents, occupancy, consequence

Four coefficients describing what the structure is built from, what it holds, who uses it and what a strike would cost. Together they set N_C, the tolerable strike frequency it is judged against.

A critical facility, a hospital, a fire station or a power plant among them, should be protected or carried through the detailed assessment whatever the screen shows. That clause applies on top of the screen, not instead of it.

L.6.2 & L.6.3

Four kinds of loss, each with its own tolerable value

The detailed assessment never sums the risks into one verdict. Each kind of loss is compared with its own tolerable line, and a structure can fail on one while passing the rest.

R1 · life or injury

Loss of life or injury

Judged against a tolerable value of 1E-5 per year by default, the strictest of the four. The owner or the authority having jurisdiction may set a different value.

R2 · service

Loss of service

The risk that a strike interrupts a service the structure depends on, defaulting to a tolerable value of 1E-3 per year.

R3 · historical significance

Loss of historical significance

For a structure of historical or cultural value, judged against a default tolerable value of 1E-3 per year, the same default as loss of service.

R4 · economic value

Loss of economic value

The annex sets no default tolerable value here. Lumex still computes R4 and reports it, and judges it against a value only if the owner enters one.

L.6.4 & Table L.6.6

Eight components, from the structure and its services

Every risk is built from these eight components, each a source of strikes paired with what it puts at stake.

Component Where the strike lands
R_A, R_B, R_CA direct strike to the structure itself
R_MA strike near the structure, not a direct hit
R_U, R_V, R_WA direct strike to a connected service, summed per service
R_ZA strike near a connected service, summed per service

The four kinds of loss are built from whichever of these eight components apply to that loss. Nothing here is summed into one number Lumex compares against a single line: R1 to R4 stay apart, all the way to the verdict.

Worked example · NFPA 780-2026

A small metal building, settled by the screen

An illustrative structure, computed by Voltrace through the simplified screen, with each step named by its clause.

The inputs

20 m by 15 m, 6 m high, standing alone

  • Ground strike-point density N_SG of 2 per km² per year (L.2), isolated, so C_D is 1 (Table L.4.2)
  • Metal structure with a metal roof: C2 of 0.5
  • Low-value contents: C3 of 0.5. Normally unoccupied: C4 of 0.5
  • Services can stop without harm: C5 of 1.0 (Tables L.5.1.2(a) to (d))
The verdict (L.5.2.1)

N_D is below N_C, so an LPS is optional

  • Collection area A_D of about 2,578 m², equation (L.4.1.1)
  • Expected strikes N_D of 0.0052 per year, equation (L.3)
  • C = C2 × C3 × C4 × C5 = 0.125, so the tolerable N_C is 1.5 × 10⁻³ ÷ 0.125 = 0.012 per year (L.5.1.1)
  • 0.0052 does not exceed 0.012, so protection is optional

Had N_D come out above N_C, an LPS would be recommended, and a critical facility goes on to the detailed assessment whatever the screen shows. The values are illustrative; your figures depend on your own structure and site.

The report

What goes into the document you sign

One assessment produces a report carrying the verdict, the simplified screen with its working, and the detailed assessment broken into the strikes to and near the structure, the risk components, the probabilities and shielding factors, and the loss factors behind each figure.

Where a proposed upgrade is worth checking, Lumex can show the risks with that protection in place alongside the risks as they stand today. The proposal is a Lumex feature, not a step of NFPA 780-2026, and it never changes the verdict, which always follows the protection actually in place.

A closing section states how the assessment was made, and every clause, equation and table the report cites is NFPA 780-2026. Lumex is an independent product and is not affiliated with or endorsed by the NFPA; the values shown here are illustrative, and the authoritative annex is defined in NFPA 780, available from the NFPA.

Coming soon

Periodic inspection reports

Once the protection is installed, it has to be inspected over its life. Periodic inspection reports for NFPA 780-2026 are in development and not yet available. Today every assessment carries a review date, with an email reminder a month before it falls due.

Lumi, the Lumex assistant

Lumi speeds the routine. Voltrace still owns every number

You just read that procedure, computed clause by clause. Lumi works around Voltrace to cut the busywork, with the signing engineer in control at every step.

Analysis

Risk-driver analysis

Reads the completed assessment and shows which component drives each risk, so you know exactly where to act.

Reporting

Drafted report narrative

Turns your computed figures into clear report prose you review, edit and approve before it is filed.

Mitigation

Ranked mitigation options

Suggests protection upgrades and shows their effect on each of R1 to R4, with the maths shown for every one.

FAQs

NFPA 780-2026 in Lumex, questions answered

Which edition of NFPA 780 does Lumex run?

NFPA 780-2026, the current edition. Lumex runs the risk assessment in its Annex L: the simplified screen and the detailed assessment, each by the annex's own equations and tables.

Is the Annex L risk assessment a requirement?

No. Annex L is informative: it guides the decision to protect a structure and is not a requirement of NFPA 780 itself. An owner, an insurer or the authority having jurisdiction may still ask for it, and Lumex produces the assessment and report they will read.

What is the difference between the screen and the detailed assessment?

The simplified screen (L.5) compares the expected strikes to the structure per year, N_D, with a tolerable strike frequency N_C built from four coefficients. The detailed assessment (L.6) works out eight risk components from the structure and its services and rolls them into four risks, R1 to R4, each judged on its own.

When should I run the detailed assessment?

When the screen is close, or when the facility should not rest on a shortcut. A critical facility, such as a hospital, a fire station or a power plant, should be protected or carried through the detailed assessment whatever the screen shows (L.5.3).

What tolerable values does Lumex use?

The annex defaults: 1E-5 per year for R1, loss of life or injury, and 1E-3 for R2, loss of service, and R3, loss of historical significance. R4, economic value, has no default, so Lumex reports it and judges it only if the owner enters a value. The owner or the authority having jurisdiction may set different values, and Lumex takes those as data.

Does Lumex recommend the protection?

Yes. It tries the measures the engineer controls, such as the physical damage and surge protection levels, re-runs the assessment for each set, and recommends the smallest set that brings every judged risk within its tolerable value (L.6.5), with the risks it leaves shown beside it.

How is the NFPA 780 engine checked?

Voltrace is tested against cases computed by a separate implementation of Annex L, written from the annex's equations and tables rather than from the engine, and the two must agree to within rounding. Every figure in a result names the clause, equation or table it came from.

How does NFPA 780 differ from IEC 62305?

NFPA 780 keeps four separate risks, each against its own tolerable value, and offers a quick screen first. IEC 62305-2:2024 combines injury to people and physical damage into one risk R, with a separate frequency of damage F. See NFPA 780 vs IEC 62305 for the full comparison.
Three standards, three engines

Working to a different standard?

Each standard runs by its own method, and a figure from one is never mixed with another. Compare all three.

What Lumex does, and what stays with you

Lumex computes the method of the standard you choose, IEC 62305-2:2024, AS 1768:2021 or NFPA 780-2026, and shows the working. It does not certify a structure. You may not issue or submit a Lumex output until a competent person, qualified where the structure is located, has reviewed the inputs and the result and signed it.

NFPA 780-2026 Annex L gives default tolerable values of 1E-5 per year for loss of life or injury and 1E-3 for loss of service and of historical significance, and the owner or the authority having jurisdiction may set others. Every NFPA 780 assessment in Lumex states the values that applied.

Get started today