Your signature is on it. Be able to defend it.
What you need when the number is questioned
An answer for every figure
Each result opens to the working behind it and the clause, table or equation it came from, in the standard you chose. When a reviewer asks where a value came from, you point at the standard, not at a spreadsheet cell nobody can read.
Checked before you trust it
A report that carries your attestation
A full PDF and a short version with the structure model, the verdict, the protection recommendation and an engineer sign-off block, with your logo and firm name (full white label on Enterprise). Under IEC the verdict is the combined risk R and, separately, the frequency of damage F. Under NFPA 780 and AS 1768 it is R1 to R4, each judged on its own.
Sign to the standard your project names
Pick the standard when you start the assessment. The inputs, the verdict and the report then follow that standard's own method, and a figure from one is never mixed with another.
One risk, one frequency, national rules applied
Nine risk components roll into the combined risk R. Four partial frequencies of damage add up to the frequency of damage F. Each is judged against its tolerable value. Where your country departs from the standard, a jurisdiction profile applies the departure and the report prints it. The Annex F check is an IEC feature.
A simplified risk assessment, then four risks
The simplified risk assessment (L.5) settles the clear cases, and the detailed assessment (L.6) judges R1 to R4 apart. Annex L is informative, but owners, insurers and the authority having jurisdiction ask for it, and any tolerable value they set goes in as data. For a critical facility, L.5.3 looks past the simplified risk assessment.
Four losses, judged apart, matched to the tool
R1 to R4 are each held to their own tolerable value (Table 2.1) and never added together. The least protection that clears all four follows C.3.4.2. Where the tool and Table 2.1 differ on cultural heritage, the report states both values. Australia only.
From appointment to a signed report
- Set up the record. Add the client, create a project for the site, and start an assessment under IEC 62305-2:2024 with the site's jurisdiction, so any national departure is applied and printed.
- Describe the building. Enter the dimensions, the surroundings, the zones and the connected lines. The risk R and the frequency of damage F update as you type, and each opens to its working.
- Find what drives the result. If R sits above the tolerable risk, the trace shows which components carry it, so you know whether the answer is an LPS class, coordinated SPDs, or both.
- Compare the protection. Propose the measures and see the risks with them beside the risks as they stand, before you commit to a recommendation.
- Review and sign. Submit the assessment for review. Once a colleague approves it, issue the signed full and short reports.
- Answer the query. When the authority's reviewer asks where a loss factor came from weeks later, open the figure to its table and clause. If something must change, reissue as a new revision.
What you hand over at the end
Full and short reports
The full PDF for the file and a short version for the client, each with the structure model, the verdict, the recommended protection and your sign-off block. See a sample IEC 62305-2 report.
The calculation trace
Every figure with the coefficient, table or tool cell behind it, ready for a design review or an authority's query.
A record that holds up
The approval, the activity log of who changed what, and each earlier report revision kept as issued, so the history of the decision survives the project.
Working to another standard? See the NFPA 780 sample report or the AS 1768 sample report.
Answer in minutes, not by rebuilding the file
A challenge usually arrives weeks after you signed. The model, the inputs you used, the values the engine applied and the revision history are all still there, so you can reconstruct your reasoning rather than defend a spreadsheet you no longer remember.
- Show the reviewer which tolerable values applied. Under IEC 62305-2:2024, clause 7.3 NOTE 1 gives a representative value and national rules may set their own, so the engine resolves it per jurisdiction. Under NFPA 780-2026 the owner or the authority may replace the Annex L defaults. Under AS 1768:2021 the owner picks the one for economic loss.
- Open any figure to the coefficient, table or tool cell it came from, down to a single loss factor.
- Read an append-only log of who changed which input and when, so a late edit is never silent.
- Propose the protection the reviewer suggests and show the risks with it beside the risks as they stand. Under IEC this covers the LPS class and SPD coordination.
- Reissue a corrected report as a new revision, with the earlier one kept intact.
See what makes an assessment traceable and a report audit ready, or compare the methods in NFPA 780 vs IEC 62305.
Questions consultants ask
Which standards can an electrical consultant run in Lumex™?
What happens when a reviewer questions a figure after I have signed?
What does the report contain?
Does Lumex™ replace my engineering judgement?
Can a colleague review an assessment before it is issued?
Get started today