Platform

The workspace for an IEC 62305 assessment

Voltrace™, a real IEC 62305-2:2024 risk engine, the current third edition, including Corrigendum 1 to Part 2, with branded audit-ready reports and a place for your whole team to work, all in the browser. Public access opens soon.

The glass facade of a modern high-rise against a clear sky, the kind of structure an IEC 62305 assessment protects
What ships at launch

Everything an assessment needs

A real IEC 62305:2024 engine, branded audit-ready reports and a workspace for your whole team, all in the browser from day one.

A real IEC 62305-2:2024 risk engine

At launch, Lumex computes collection areas, dangerous-event rates, damage probabilities and loss factors straight from the standard's coefficients, then rolls the eight risk components into the risk R and the frequency of damage F, each with a verdict against its tolerable threshold.

  • The risk R and frequency of damage F, across the eight components
  • Full coefficient trace behind every result
  • What-if scenarios for LPS class and SPD coordination

See the full method, step by step

Risk result Results calculated according to IEC 62305-2:2024
IEC 62305-2:2024
Tolerable threshold
R Loss of human life Exceeds RT
F Frequency of damage Within tolerable

Branded, audit-ready reports

Every assessment produces a PDF deliverable with cover, executive summary, methodology, per-zone results and an engineer attestation block, carrying your logo, accent colour and sign-off. A periodic inspection report per IEC 62305-2 is part of the launch set too.

  • Your branding, your sign-off block
  • Methodology and per-zone results in full
  • Periodic inspection report per IEC 62305-2
Risk Assessment Report Branded PDF, issued from the assessment
PDF
RWithin tolerable
FWithin tolerable
Approved
Signature of A. Sharma A. Sharma  Lead Assessor

Team workspaces

A project holds many sites, each independently assessed with its own zones, report and revision history. Roles match how firms divide the work, and the project rollup rebuilds automatically as the team makes changes.

  • Project, site and zone structure
  • Admin, Project Manager and Sales Manager roles
  • Independent revision lines per site
Pune Metro, Phase 2 Sites, roles and revision history
Project
2 of 3 sites assessed
+1
4 peopleAdmin, Project Manager, Sales Manager
Tower A Assessed
Substation 3 In review
Warehouse B Draft
Also at launch

Built for how the assessment actually gets done

Roles

Roles and collaboration

Admin, Project Manager and Sales Manager roles match how firms divide the work.

Billing

GST-ready invoicing

CGST, SGST and IGST split, GSTIN on invoice, FY-sequenced numbering and multi-currency billing.

Audit

Audit trail

An append-only log of every edit, approval and impersonation session.

Access

Role-based access control

Admin, Project Manager and Sales Manager roles scope every project, report and billing action, with the whole team on one workspace.

Tenancy

Multi-tenant isolation

Each firm's data is isolated to its own account and encrypted, handled in line with India's DPDP Act and never shared across firms.

Exports

Compliance-ready exports

Audit-ready PDF reports and the periodic inspection record, each carrying a full coefficient trace, ready to file with the building owner.

On the roadmap

AI that assists the engineer, never the number

The risk computation stays fully AI-free, and the same inputs always give the same numbers. The features below are planned for launch to help around the engine, with the signing engineer always in control. Each is clearly marked.

Today

AI never touches the number

Every risk value is computed straight from the IEC 62305-2 coefficients. AI never writes, edits or overrides a result, and that rule is enforced in code.

Planned for launch

AI around a proprietary engine

Assistive AI that surrounds Voltrace to speed the routine, never to calculate or change a risk value.

Planned for launch

Automated risk analysis

An AI pass that reads a finished assessment and highlights what is driving each risk, for the engineer to review.

Planned for launch

Intelligent report drafting

AI-drafted narrative sections, the executive summary and recommendations, that you edit and approve before anything is issued.

Planned for launch

Mitigation recommendations

AI-suggested protection options, LPS class and SPD coordination, ranked by effect, with the signing engineer making the call.

Planned for launch

Predictive assessment

Early flags for likely-failing risks as you enter inputs, so you can catch a problem before the full computation.

A lightning strike over a city skyline at dusk, the kind of exposure an IEC 62305 risk assessment quantifies
The report your stamp can stand behind. AI built into every assessment.
FAQ

Got Questions?
We've Got Answers

Find quick answers to the most asked questions about the engine, the standard and your data.

What do I get from Lumex?
The deliverable is a 10 to 14 page PDF: the structure model, the risk R and frequency-of-damage F computation, protection recommendations, an engineer sign-off block and a revision history. It is the document a building owner files for compliance. Lumex also produces a short periodic LPS inspection checklist for the routine maintenance cycle.
Is Lumex a full IEC 62305:2024 engine or a simplified estimator?
It is the full IEC 62305:2024 method, not a simplified estimator. Lumex computes every risk component, the risk R of loss of human life and the frequency of damage F from the standard's coefficients, comparing each against its tolerable value. Every number on the report traces back to the clause behind it, and the how it works page walks through the method.
Does Lumex handle periodic LPS inspections (IEC 62305-3)?
Yes. Alongside the 62305-2 risk assessment, Lumex produces a periodic LPS check per IEC 62305-3: a 2 to 3 page checklist for the routine (typically annual) maintenance cycle, covering physical LPS condition, the earth-resistance reading, a defect list and photo attachments.
Can I put my own branding on the reports?
Yes, on paid plans. Your reports carry your firm's name and logo, your accent colour and your sign-off line, so the deliverable looks like your firm's, not ours. The free tier carries a Lumex watermark. See the pricing page for what each plan includes.
What is IEC 62305 and how does the assessment work?
IEC 62305 is the international standard for protection against lightning. Part 2 (IEC 62305-2) defines the risk method: you assess a structure and the engine computes the risk components, the risk R of loss of human life and the frequency of damage F, comparing each against its tolerable value. The how it works page walks through the method in detail.
Is my data safe, and what about privacy?
Each firm's workspace is kept separate, and we handle personal data in line with India's Digital Personal Data Protection (DPDP) Act and the data-protection laws that apply to you. Our privacy policy sets out what we collect and how it is used.

Get started today

See the platform in action, on your next assessment

Contact our team